level 2 ev charging. wake up with a “full tank”.

Standard wall outlets (Level 1) can take over 20 hours to charge an EV. In a Saskatchewan winter, that’s not just slow, it’s impractical. Our Level 2 installations provide a full charge in 4-8 hours, ensuring your battery is conditioned and ready to go, even at -30°C.

The Flow electric installation standard

hardwird for reliability

We prioritize hardwired connections over "plug-in" outlets. It’s safer, more durable for high-heat continuous loads, and eliminates nuisance tripping.

tsask and saskpower ready

Every job is permitted and inspected. We ensure your garage wiring meets the newest 2024 Canadian Electrical Code standards.

universal compatibility

We install all major brands, including Tesla Wall Connectors, Flo, and ChargePoint.

Expert EV Charging Station Installation in Regina, Saskatchewan.

Commercial & Fleet Solutions

Attract tenants or future proof your business. We design multi-unit charging banks with RFID access and load sharing capabilities to keep your infrastructure costs low.

don’t let a 100a panel stop you from buying an ev.

Most Regina homeowners think a Level 2 charger requires a costly 200A panel upgrade, but we have a smarter way. As an authorized Emporia reseller, we specialize in Dynamic Load Management.

By pairing the Emporia Pro Charger with the Vue 3 Energy Monitor, we can “clock down” your charger in real time when your home hits its limit, then ramp it back up when the oven or dryer finishes. This allows you to get a high-speed charge on your existing 100A panel while staying 100% code-compliant.

See how the Emporia Smart System saves you $4,000+ on your installation here.

If you are keen on using another brand of charger, we use Electric Vehicle Energy Management Systems (EVEMS) like Black Box or DCC.

These devices monitor your home’s power in real time. If you turn on your oven and dryer, the system temporarily pauses the car charger.

This allows you to install a Level 2 charger without a $5,000 service upgrade.

FREQUENTLY ASKED QUESTIONS

  • We can make it work! First we will do a load calculation on your home and then we can come up with a couple different options so you can enjoy level 2 charging in Regina!

  • When wired with proper wiring methods, most Level 2 chargers are rated for outside installation and should pose no issue with winter weather.

  • Yes. We handle the load calculation part, conversing with TSASK inspectors and pulling permits so the installation is on point.

Electrical conduit and equipment mounted on a plywood wall inside a wooden frame shed or workshop, with wood scraps on the floor.
Interior wall of a building with wood framing and OSB sheathing. There is a black power cord hanging on the right and a black flexible pipe in the middle. On the left side near a window, a black plastic cover with a string wrapped around it and a cordless phone on top.

ON THE BLOG

Why the Emporia Vue 3 & Level 2 Charger are the Ultimate Regina Power Hack

EMBRACE THE FUTURE OF DRIVING WITH FLOW ELECTRIC

Choosing Flow Electric for your EV charging station installation means you're investing in the future of transportation.

Enjoy the convenience of charging your electric vehicle at home, reduce your carbon footprint, and prepare your household for the evolving world of electric mobility. Let us help you make the switch to a more sustainable lifestyle with our expert EV charging station installation services.